We have delivered on the turnkey basis ( documentation, material supply, installation and dismantling) of refractory lining for cement plant LafargeHolcim, Austria. The subject of the supply was lining for the new calcination channel, cyclone C5, kiln inlet and part of the tertiary air duct.
Part of the project was also the demolition of existing linings in the range of about 400t. We performed these demolition work in a very short time of 10 days.
The total amount of newly delivered refractory was about 850 tons.
TEPLOTECHNA DIS s.r.o.
Litovelská 553/26
779 00 Olomouc, Czech republic
IČ: 25397338, DIČ: CZ25397338
TEPLOTECHNA DIS Montáže s.r.o.
Litovelská 553/26
779 00 Olomouc, Czech republic
IČ: 17263701, DIČ: CZ17263701
CONTACTS
T + 420 582 770 390—399
E teplotechnadis@teplotechnadis.cz