In 2009 we did reconstruction of linings in second kiln line in cement plant Mokrá.

Reconstruction has been done at these parts:

  • Cyclone C1 – 2 pcs
  • Cyclone C2 – ceiling, including flange
  • Cyclone C3 – lower part- cone
  • Cyclone C4 – upper cylindrical part, including ceiling and flange
  • Channel K21
  • Channel K43 –transition part with expansion joint
  • Chute of raw material from C1, C3, C4
  • Exchanger (KKN) + vírová komora + elbow of exchanger
  • Calcinating chamber (SCC)
  • Channel KKN – SCC
  • Inlet chamber
  • Cooling chamber, including connection to inlet chamber
  • Tetriary airduct + NOx
  • Kiln Hood
  • Great cooler

 

Total weight of linings was 950 tons.